cms_SC: 9333

In collaboration with The Seattle Times, Big Local News is providing full-text nursing home deficiencies from Centers for Medicare & Medicaid Services (CMS). These files contain the full narrative details of each nursing home deficiency cited regulators. The files include deficiencies from Standard Surveys (routine inspections) and from Complaint Surveys. Complete data begins January 2011 (although some earlier inspections do show up). Individual states are provides as CSV files. A very large (4.5GB) national file is also provided as a zipped archive. New data will be updated on a monthly basis. For additional documentation, please see the README.

Data source: Big Local News · About: big-local-datasette

This data as json, copyable

rowid facility_name facility_id address city state zip inspection_date deficiency_tag scope_severity complaint standard eventid inspection_text filedate
9333 PRUITTHEALTH BAMBERG 425104 439 NORTH STREET BAMBERG SC 29003 2011-06-02 253 E 0 1 UJW911 On the days of the survey, based on observations and interviews, the facility failed to provide effective housekeeping and maintenance services for the bathrooms on one of two resident care units. Multiple rooms/bathrooms on the 200 Hall had soiled walls and baseboards, as well as stained floors, toilet bowls, and sinks. In addition, the 100 Hall Spa #2 had excessive soiled build-up on the baseboards. The findings included: During the Initial Tour on 200 Hall with Licensed Practical Nurse #4 on 5-31-11 beginning at approximately 11:30 AM, and during the environmental tour with the Maintenance Supervisor and Administrator on 6-2-11 at 9 AM, the following housekeeping/maintenance concerns were identified and confirmed: -Room 202 bathroom had pink-orange build-up on the baseboards. -Toilets had rust-colored stains inside the bowls in the bathrooms for Rooms 203, 205, 206, 207, 208, 209, 211, and 215. -Bathroom floor covering was stained (rust-colored) behind toilets and/or in corners around the toilet and sink areas in Rooms 205, 206, 207, 208, 209, 211, 212, 213, 214, and 215. -Bathroom baseboards had heavy pink-orange build-up in Rooms 202, 206, 208, 209, 210, 214, and 215. -Rooms 207 and 209 bathrooms had cracked toilet bowls and the grout at the bases was soiled dark brown/black. -Bathroom sinks were in poor repair in Rooms 208, 209,211, 213, 214, and 215. They appeared as if unsuccessful attempts had been made with either porcelain repair or some type of paint, resulting in a chalky appearing porous-type substance on the surfaces. -Dried spills were noted on the walls in the bathrooms in Rooms 205 and 207. During the initial tour of the facility on 05/31/11 at approximately 12 noon, an observation was made of the Spa Room on the 100 unit. The shower in the Spa Room was observed to be soiled with a filmy build-up around the bottom of the shower walls. Multiple observations were made during the survey and the condition of the shower stall remained unchanged. 2015-05-01